The front of the cab, before doing any work. This is the original bush dash, minus some interior trim, and a messily-wired switch console on the left. When I first got the bus, the whole thing was this grimy.
The unfinished outside front of the bus. After this picture was taken, a sizeable tree branch fell and took out the driver's side mirror and left a gash in that corner.
This was one of the largest jobs on the bus. The painting is almost done; there is mostly just detail work left. I also need to build an antenna platform, and reinstall my solar array.
I built a loft in the bus, over the cab and extending over the hood (see the floorplan).
Kitchen and Bathroom 10 Jan 2010
Kitchen and Bathroom
Updated: 10 Jan 2010
Categories: the bus
The kitchen (see the floorplan) is set on top of the rear wheels, forward of the bathroom and aft of the main area. It's about 80 ft2, or a third of my total floor area.